Ms. Mac's U.S. History
  • Welcome To Ms. Mac's Class
    • Class Syllabus
    • Class Calendar
  • U.S. History Units of Study
    • Pre-Columbian America and The Columbian Exchange >
      • Pre-Contact America: Clovis Points
      • Pre-Contact America: Buffalo Hunts and Whaling
      • Pre-Contact America: Cahokia-The Corn People
      • Christopher Columbus
    • Colonial Era >
      • Juan Cabrillo and the San Salvador
      • Jamestown
      • Pilgrims, Puritans and Colonial Wars
      • Atlantic Slave Trade and Anti-Slavery Literature
      • Early American Military History
    • American Revolution >
      • Declaration of Independence
      • The Continental Soldier
      • Rappin' the Revolution
      • Founding Fathers on Broadway!
    • Slavery >
      • Virginia Slave Laws
      • Frederick Douglass
      • Atlantic Slave Trade and Antislavery Art and Poetry
    • Constitution >
      • Constitutional Convention
      • Bill of Rights
      • School Court Cases
      • COTUS Booklet
    • Western Expansion >
      • Lewis and Clark >
        • Native Americans
        • Members of Corps of Discovery
        • Jefferson's Vision
        • Mind of Lewis and Clark
        • Corps of Discovery
        • Ethnography
        • Scientific Discoveries
        • Adventures
    • Introducing, Mr. Lincoln >
      • Lincoln's Daily Life in Washington
      • Lincoln Essential Questions
      • Understanding Lincoln
      • Gettysburg Address and Henry V
      • Lincoln-Douglas Debates
    • Civil War Simulation >
      • Massachusetts 54th
      • Berdan Sharpshooters
      • Irish Brigades
      • Zouaves
      • Calvary
      • Artillery
  • Special Projects
    • Bayard Wilkeson Project
    • Ford's Theatre Oratory Project
    • National History Day
    • Hamilton! Lesson Using the Broadway Show >
      • Rappin in the Classroom
      • Founding Fathers on Broadway!
      • Hamilton Traveling Exhibit Activities
    • 9/11 History versus Memory
    • The South in American History
    • Books of Study >
      • McCullough's 1776
      • Ambrose's Undaunted Courage
    • Digital History
  • Contact

Rappin in the Classroom

Where learning history is fun!!!

Prezi-Historical Raps "The Steps"

Whole Classroom Rap
​JOSEPH PLUMB MARTIN

After choosing a BEAT and creating a HOOK, students will be assigned to one of three groups, "adventures," "dangers," or "sufferings." In those groups, students will study the primary source excerpts from A Narrative of a Revolutionary Soldier: Some of the Adventures, Dangers, and Sufferings of Joseph Plumb Martin. 

Adventures

I leave to my reader to judge. It is fatiguing, almost beyond belief, to those that never experienced it, to be obliged to march twenty-four or forty-eight hours (as very many times I have had to) and often more, night and day without rest or sleep, wishing and hoping that some wood or village I could see ahead, might prove a short resting place, when, alas, I came to it, almost tired off my legs, it proved no resting place for me. How often have I envied the very swine their happiness, when I was wet to the skin, and wished in vain for that indulgence. And even in dry, warm weather, I have often been so beat out with long and tedious marching, that I have fallen asleep while walking the road, and not been sensible of it till I have jostled against some one in the same situation; and when permitted to stop and have the superlative happiness to roll myself in my blanket, and drop down on the ground, in the bushes, briars, thorns or thistles, and get an hour or two’s sleep, O! how exhilerating. Fighting the enemy is the great scarecrow to people unacquainted with the duties of an army.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 248). Penguin Publishing Group. Kindle Edition.
 
No one who has never been upon such duty as those advanced parties have to perform, can form any adequate idea of the trouble, fatigue and dangers which they have to encounter. Their whole time is spent in marches, (especially night marches,) watching, starving, and, in cold weather, freezing and sickness. If they get any chance to rest, it must be in the woods or fields, under the side of a fence, in an orchard or in any other place but a comfortable one;— lying down on the cold and often wet ground, and, perhaps, before the eyes can be closed with a moment’s sleep, alarmed and compelled to stand under arms an hour or two, or to receive an attack from the enemy; and when permitted again to endeavour to rest, called upon immediately to remove some four or five miles to seek some other place, to go through the same manoeuvring as before; for it was dangerous to remain any length of time in one place for fear of being informed of by some tory inhabitant, (for there were a plenty of this sort of savage beast during the revolutionary war,) and ten thousand other causes to harrass, fatigue and perplex, which time and room will not permit me to enumerate.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 59-60). Penguin Publishing Group. Kindle Edition.
 
We here gambled a little for some liquor, by throwing a small dart or stick, armed at one end with a pin, at a mark on the ceiling of the room;  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 100). Penguin Publishing Group. Kindle Edition.
 
I had often heard of some of the low bred Europeans, especially Irishmen, boxing with each other in good fellowship, as they termed it; but I could not believe it till I was convinced by actual demonstration. While we tarried here, I was one day at a sutler’s tent, or hut, where were a number of what we Yankees call “Old countrymen;” soon after entering the hut, I observed one who was, to appearance, “pretty well over the bay.” Directly there came in another who, it appeared, was an old acquaintance of the former’s; they seemed exceeding glad to see each other, and so must take a drop of “the cratur” together; they then entered into conversation about former times. The first mentioned was a stout athletic fellow, the other was a much smaller man. All of a sudden the first says, “faith, Jammy, will you take a box.” “Aye, and thank ye too,” replied the other. No sooner said than done, out they went, and all followed to see the sport, as they thought it, I suppose; it was a cold frosty day, in the month of December, the ground all around the place, was ploughed and frozen as hard as a pavement. They immediately stripped to the buff, and a broad ring was directly formed for the combatants, (and they needed a broad one,) when they prepared for the battle.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 125-126). Penguin Publishing Group. Kindle Edition.
 
There were three regiments of Light Infantry, composed of men from the whole main army,— it was a motly group,— Yankees, Irishmen, Buckskins and what not. The regiment that I belonged to, was made up of about one half New-Englanders and the remainder were chiefly Pennsylvanians,— two setts of people as opposite in manners and customs as light and darkness, consequently there was not much cordialty subsisting between us; for, to tell the sober truth, I had in those days, as lief have been incorporated with a tribe of western Indians, as with any of the southern troops; especially of those which consisted mostly (as the Pennsylvanians did,) of foreigners. But I was among them and in the same regiment too, and under their officers, (but the officers, in general, were gentlemen,) and had to do duty with them; to make a bad matter worse, I was often, when on duty, the only Yankee that happened to be on the same tour for several days together. “The bloody Yankee,” or “the d— d Yankee,” was the mildest epithets that they would bestow upon me at such times. It often made me think of home, or at least of my regiment of fellow-Yankees.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 117). Penguin Publishing Group. Kindle Edition.

Dangers

​To have to lie, as I did, almost every other night, (for our duty required it,) on the cold and often wet ground, without a blanket, and with nothing but thin summer clothing, was tedious. I have often, while upon guard, lain on one side until the upper side smarted with cold, then turned that side down to the place warmed by my body, and let the other take its turn at smarting, while the one on the ground warmed; thus alternately turning for four or six hours, till called upon to go on sentry, as the soldiers term it; and when relieved from a tour of two long hours at that business, and returned to the guard again, have had to go through the operation of freezing and thawing for four or six hours more;— in the morning, the ground as white as snow, with hoar frost. Or, perhaps it would rain all night like a flood; all that could be done in that case, was, to lie down, (if one could lie down,) take our musket in our arms and place the lock between our thighs, “and weather it out.”  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 42). Penguin Publishing Group. Kindle Edition.
 
I had the canopy of heaven for my hospital, and the ground for my hammock. I found a spot where the dry leaves had collected between the knolls; I made up a bed of these, and nestled in it, having no other friend present but the sun to smile upon me. I had nothing to eat or drink, not even water, and was unable to go after any myself, for I was sick indeed. In the evening, one of my messmates found me out, and soon after brought me some boiled hog’s flesh (it was not pork) and turnips, without either bread or salt. I could not eat it, but I felt obliged to him notwithstanding; he did all he could do— he gave me the best he had to give, and had to steal that, poor fellow;— necessity drove him to do it to satisfy the cravings of his own hunger, as well as to assist a fellow sufferer.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 48-49). Penguin Publishing Group. Kindle Edition.
 
Almost every one has heard of the soldiers of the Revolution being tracked by the blood of their feet on the frozen ground. This is literally true; and the thousandth part of their sufferings has not, nor ever will be told. That the country was young and poor, at that time, I am willing to allow;  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 245). Penguin Publishing Group. Kindle Edition.
 
Accordingly two of the club went out and shortly after returned with a Hissian, a cant word with the soldiers, for a goose. The next difficulty was, how to pluck it; we were in a chamber and had nothing to contain the feathers. However, we concluded at last to pick her over the fire and let that take care of the feathers. We dressed her and then divided her amongst us; if I remember rightly, I got one wing. Each one broiled his share and ate it, as usual, without bread or salt. After this sumptuous repast, I lay down and slept as well as a gnawing stomach would permit. In the morning we found a sad witness of our overnight’s adventure to testify against us; the whole funnel of the chimney was stuck full of feathers from top to bottom, and it being a very calm night the street opposite the house was as full of them as the chimney. We would have set the chimney on fire, but having nothing to do it with, we concluded to let chimney and street unite in their testimony against us if they pleased; but as we marched off early in the morning we heard no more about the goose.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 72-73). Penguin Publishing Group. Kindle Edition.
 
The greatest inconvenience we felt, was the want of good water, there being none near our camp but nasty frog ponds, where all the horses in the neighbourhood were watered, and we were forced to wade through the water in the skirts of the ponds, thick with mud and filth, to get at water in any wise fit for use, and that full of frogs. All the springs about the country, although they looked well, tasted like copperas water, or like water that had been standing in iron or copper vessels. I was one day rambling alone in the woods, when I came across a small brook of very good water, about a mile from our tents; we used this water daily to drink, or we should almost have suffered. But it was “the fortune of war.”  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 205). Penguin Publishing Group. Kindle Edition.
 
We drew a day’s ration of beef and flour,— what was called a pound of each; the flour, perhaps, was not far from its nominal weight, but the beef was, as it always was in such cases, and indeed in all others in the army, not more than three fourths of a pound, and that, at the best, half bone. And how was it cooked?— Why, as it usually was when we had no cooking utensils with us,— that is, the flour was laid upon a flat rock and mixed up with cold water, then daubed upon a flat stone and scorched on one side, while the beef was broiling on a stick in the fire. This was the common way of cookery when on marches, and we could get any thing to cook, and this was the mode at the time mentioned. After I had satisfied my hunger, I lay down upon the ground and slept till within about half an hour of sunset.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 66-67). Penguin Publishing Group. Kindle Edition.
 

Sufferings

The inhabitants here were almost entirely what were in those days termed tories. An old lady, of whom I often procured milk, used always, when I went to her house, to give me a lecture on my opposition to our good king George. She had always said, (she told me,) that the regulars would make us fly like pigeons. My patients would not use any of the milk I had of her, for fear, as they said, of poison;— I told them I was not afraid of her poisoning the milk, she had not wit enough to think of such a thing, nor resolution enough to do it if she did think of it.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 49). Penguin Publishing Group. Kindle Edition.
 
Wishing to be the first in the boat, I ran down the wharf, and jumped into it. There happened to be the butt part of an oar lying on the bottom of the boat, and my right foot, on which the whole weight of my body bore, alighted, in my leap, directly upon it, lengthwise; it rolled over and turned my foot almost up to my ankle,— so much so, that my foot lay nearly in a right angle with my leg. I had then to go to the ferry, where I was landed, and having no acquaintance with any of the party, most of whom were New-Yorkers, and consequently, at that time, no great friends to the Yankees, I was obliged to hop on one foot all the way, (upwards of five miles,) not being able in the whole distance to procure a stick to assist me, although I often hobbled to the fences on each side of the road in hopes to obtain one. It was dark when I was landed at the ferry, and it was quite late before I arrived at the camp; some of my messmates went immediately for the Surgeon, but he was at a game of backgammon and could not attend to minor affairs; however, in about an hour he arrived, bathed my foot, which was swelled like a bladder, fumbled about it for sometime, when he gave it a wrench, which made me, like the old woman’s dying cat, “merely yawl out.”  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 61). Penguin Publishing Group. Kindle Edition.
 
I was soon…ordered off, in company with four hundred others of the Connecticut forces…to be inoculated with the small pox…I left the hospital on the sixteenth day after I was inoculated, and soon after joined the regiment, when I was attacked with a severe turn of the dysentery, and immediately after recovering from that, I broke out all over with boils; good old Job could scarcely have been worse handled by them than I was;— I had eleven at one time upon my arm, each as big as half a hen’s egg, and the rest of my carcass was much in the same condition. I attributed it to my not having been properly physicked after the small pox; in consequence of our hospital stores being in about the same state as the commissary’s.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (p. 58). Penguin Publishing Group. Kindle Edition.
 
We arrived at the Valley Forge in the evening; it was dark; there was no water to be found, and I was perishing with thirst. I searched for water till I was weary, and came to my tent without finding any;— fatigue and thirst, joined with hunger, almost made me desperate. I felt at that instant as if I would have taken victuals or drink from the best friend I had on earth by force. I am not writing fiction, all are sober realities. Just after I arrived at my tent, two soldiers, whom I did not know, passed by; they had some water in their canteens which they told me they had found a good distance off, but could not direct me to the place as it was very dark. I tried to beg a draught of water from them but they were as rigid as Arabs. At length I persuaded them to sell me a drink for three pence, Pennsylvania currency, which was every cent of property I could then call my own;  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 89-90). Penguin Publishing Group. Kindle Edition.

In the height of the cannonade it was desirable to hoist a signal flag for some of our gallies, that were lying above us, to come down to our assistance. The officers inquired who would undertake it; as none appeared willing for some time, I was about to offer my services; I considered it no more exposure of my life than it was to remain where I was; the flagstaff was of easy ascent, being an old ship’s mast, having shrouds to the ground, and the round top still remaining. While I was still hesitating, a sergeant of the Artillery offered himself; he accordingly ascended to the round top, pulled down the flag to affix the signal flag to the halyard, upon which the enemy, thinking we had struck, ceased firing in every direction and cheered. “Up with the flag!” was the cry of our officers in every part of the fort. The flags were accordingly hoisted, and the firing was immediately renewed. The sergeant then came down and had not gone half a rod from the foot of the staff, when he was cut in two by a cannon shot. This caused me some serious reflections at the time. He was killed! had I been at the same business I might have been killed; but it might have been otherwise ordered by Divine Providence,— we might have both lived,—  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 79-80). Penguin Publishing Group. Kindle Edition.

Our sergeants and myself obtained permission to go down to Philadelphia for a couple of days, to visit some of our acquaintance in that city, but particularly to carry some little clothing to one of our men in the hospital there, who was wounded at the siege of Yorktown, and had had his leg amputated above the knee. I carried him, among other things, a pair of stockings and shoes; his nurse told him, that he was more lucky than most other people, for where they got one pair of shoes and stockings, he got two. Poor fellow! I never saw nor heard of him afterwards. Thus poor soldiers pass out of notice.  Martin, Joseph Plumb (2010-06-01). A Narrative of a Revolutionary Soldier: Some Adventures, Dangers, and Sufferings of Joseph Plumb Martin (Signet Classics) (pp. 221-222). Penguin Publishing Group. Kindle Edition.
Proudly powered by Weebly